OSHA's proposed Emergency Response Standard replaces the 1980 Fire Brigades rule, and it incorporates 22 NFPA standards by reference. Incorporation by reference is the part worth understanding: those consensus standards stop being best practice and become law for covered organizations.

The Department of Labor's July 2026 agenda projects a final rule in April 2027. Comment periods closed in July 2024 and January 2025, and an informal hearing ran that November and December.

OSHA's own position is that departments already following these standards largely comply already. That is the trap. Following a standard and being able to document that you followed it are different things, and only one of them survives an inspection. A department with current pump tests, hydro dates, gear inspections and training hours but no records to show for them is in the same position as a department that did none of it.

The volunteer service has argued the administrative burden is the real cost, not the safety requirements. That argument is about paperwork, which means the departments that get hurt in 2027 are the ones still keeping it on clipboards.

A large share of the 22 are recordkeeping and control standards, and several are already in CADReport as tracked requirements. Departments on the system can turn those on now and arrive at a final rule with years of documented history instead of a start date.

What you can start today

Each of these is already a followable requirement, with due dates, field entry and an exportable record.

Apparatus in-service checks, pump tests and aerial device testing (NFPA 1910)
SCBA flow tests and cylinder hydrostatic retests (NFPA 1850, DOT 49 CFR)
Turnout gear advanced inspection and retirement tracking (NFPA 1850 §7.3)
Hose service tests and ground ladder proof-load tests (NFPA 1930)
Member medical evaluations and annual OSHA refreshers (NFPA 1580)
Certification currency and training hours, per member and per unit
Pre-incident plan currency (NFPA 1660)
Standards tracking
MORE FROM INSIGHTS
REPORTINGOCTOBER 2026
NERIS 1.5 is live, and Incident Analysis is the first module built on top of the incident
REPORTINGFEBRUARY 2026
NFIRS is offline. NERIS is the only national system.
Records you can produce on demand
Enter it once, where it is easiest to get right, and every report draws from the same record.
Request access